AD”ELEM”, REK BITOLA, Bitola

  • Performed projects in the year 2007
    - Annual maintenance for 2007 in TE Bitola
    - Performing of anti-corrosive protection
    - Electric equipment delivery for auxiliary energizing  of the SRs 200/1 Excavator
    - Delivery of the mobile reflectors and illumination equipment
    - Delivery of the mobile TS 6/0.4kV with embed transformer 630kVA
    - Supply and appointment of the 6kV cable from TS “JUG” to Pump station “Ezero”
    - Delivery of the NN cable, PP41 4x70
    - Pump station  performance, Triangla-Madzari-Hipodrom
    - Performing of the anticorrosive protection for mining equipment at PK-brod Gneotino
  • Performed projects in the year 2008
    - VN cable and distributing-joined trusses
    - Performing of the reconditioning stuffs at REK Bitola
    - Performing of the anticorrosive protection of the metal works and steel construction
  • Performed projects in the year 2009
    - Dismantling and mounting of the 3 port cabins from HEC Kozjak to the Mineral area at PK -Brod Gneotino
    - Mobile transformer station delivery for bulldozer energizing at PK-Brod Gneotino
    - Performing of the reconditioning stuffs at REK Bitola-PE “Termoelektrani” Blocks
    - Manual labour hiring for the interventions on call at PE “Termoelektrani” and PE “Rudnici” -Bitola
  • Performed projects in the year 2010
    - Manual labour hiring for the present maintenance on call at PE “Termoelektrani” and PE “Rudnici” -Bitola

EVN, Skopje

  • Performed projects in the year 2007
    - Energy cables 1х240/25мм 1х150/25мм2
    - VN fuses and bаses
    - UPE insulated energy cables12/20кВ and 20/35кВ
    - Energy cable with plastic insulation 0,6/1кВ
  • Performed projects in the year 2008
    - Performing of construction, land and electro-mounting work
    - Supply of plastic fundaments for мерноразводен ормар
    - Performing of land and electro-mounting work on 35кВ section Kondovo - Saraj
    - Performing of land and electro-mounting work on 35кВ section Berovo - Pehcevo
  • Performed projects in the year 2009
    - Supply of copper-covered strip and steel wire
    - Performing of the electric and construction works at ‘KEC Vasil Glavinov’ Skopje
    - Performing of the electric and construction works at ‘KEC Gjorce Petrov’ Skopje
    - Performing of the electric and construction works for project:  ‘Goce Dzeparovski’ Skopje
    - Performing of the electric and construction works at ‘SARAJ Municipality ’ Skopje
    - Performing of the electric works – MBTS 20 (10)/0.4kV, for  ‘DETOIL ’ Skopje
    - Performing of the electric works for project : “Pandeleski Cvetan”
    - Performing of the electric works for project : “American construction”
    - Plastic foundation delivery

GA-MA, Skopje

  • Performed projects in the year 2007
    - Performing of construction works for GMRS of the gas line toward economic zone “Bunardzic”
  • Performed projects in the year 2009
    - Performing of the construction works at gas line system
    - Performing of the electric and cathode protection works for approach road and MS on the project: TE-TO, Skopje
    - Performing of the electric and cathode protection works for measure-regulating stations
    - Performing of the construction works at ‘TO-Zapad ’ Skopje
    - Performing of the electric and cathode protection works for the project: TO-Zapad, Skopje
  • Performed projects in the year 2010
    - Drilling under railway line , project TE-TO
    - Constructive works performing on the new designed gas pipeline - TO istok-SAEM INVEST
FAKOM AD Skopje
  • Performed projects in the year 2008
    - Installation and demount of the thermal insulation
    - Painting and anti-corrosive protection of the oven
  • Performed projects in the year 2009
    - Installation of the anti-corrosive protection  in “Tineks” Skopje
    - Thermal insulation works in  Titan – Usje
    - Installation of the anti-corrosive protection in Jonson –Bunardzik
    - Hydro-insulation of the pipe-line Ф 168mm with  ‘condor band’, with brazing
    - Thermal-insulation of the damaged pipes for the concomitant steam at the Operating plant
    - Thermal-insulation in the ‘ Topla Valavnica’-operating plant
    - Performing anti-corrosive protection of the “Dame Gruev” facility
    - Performing of the anticorrosive protection of the steel construction - project KARTEL, Skopje
    - Insulating of the pipes Ф50mm, inlaid with glass wool , and galvanized sheet metal - project:  Makstil AD- Skopje, “Potisna pecka” No.2
  • Performed projects in the year 2010
    - Performing of the anticorrosive protection of the steel construction - project “Mega-Trubarevo”, Skopje

MAKSTIL Skopje

  • Performed projects in the year 2006
    - Replacement of the deteriorate conduit  for  second cooling
    - Performing and projecting of affable road
    - Concreting of the floor beside plate
    - Reconstruction of platform for old iron mill
  • Performed projects in the year 2007
    - Making of wardrobe lockers
    - Cleaning of the soaked dust in the “Celicana” plant
    - Recovery of the sanitarians and wardrobes
    - Replacement of the ribbed plate with transparent tables on the plant roof
    - Repairing of two toilets in operating workroom at VDL
    - Repairing of two toilets at RE Digalki
    - Containers repairing and performance of the prefab
  • Performed projects in the year 2008
    - Steel dust cleaning
    - Dust cleaning in the crane trails
    - Cat -crane No.55, sandblasting and dyeing
    - Gas pipeline cleaning
    - Repairing of the toilets in Operating workroom
    - Preparing of the Striper hall for stockroom
    - Concreting in the Roller workroom
    - Foundation concreting
    - Repairing of the toilets at Striper hall
    - Concreting from CD-9 to CD-14 area

ZORS “ALKA” Skopje

  • Performed projects in the year 2006
    - Performing of construction works: Building of the Cultural house in village Zitineni, Centar Zupa Municipality
    - Performing of construction works: Sport and cultural developing in village Prisojnica, Mavrovi Anovi Munacipality
  • Performed projects in the year 2007
    Reconstruction of the Minor Centre in the v. Golem Papradnik, community Centar Zupa
  • Performed projects in the year 2008
    - Performing of construction and reconstruction works: sports court OU "MM Brico"
  • Performed projects in the year 2009
    - Construction of water supply system in v.Slivnik

RUEN Kocani

  • Performed projects in the year 2006
    - Performing of roof-covering works I
    - Performing of new horizontal gutters in production workshop
    - Performing of roof-covering works II
    - Performing of roof-covering works III
    - Performing of roof-covering works IV
    - Installation of ventilation pipes
    - Performing of external air duct, reinstallation and installation of the transmit installation, mechanical whiten, recovery of the facade tin panels and installation of the plastificated tins, vertical and horizontal gutters

AIRKON Skopje

  • Performed projects in the year 2006
    - Performing of electric installation on existing TS 10/0.4kV

KOSMOFON Skopje

  • Performed projects in the year 2006
    - Annual Agreement for basic station maintaining
  • Performed projects in the year 2007
    - Electrification of the base stations

BORTAS

  • Performed projects in the year 2006
    - Dislocation of the na 10kV electric installation in Rasadnik, Kisela Voda Munacipality
MEPRING Engineering Skopje
  • Performed projects in the year 2006
    - Reconstruction of  35kV; 20kV i 10kV pylons in Radovis

Makedonska Kamenica Munacipality

  • Performed projects in the year 2006
    - Annual Agreement for installing and maintain  of the road illumination in Makedonska Kamenica
  • Performed projects in the year 2007
    - Annual Agreement for installing and maintenance  of road illumination in Makedonska Kamenica

J.P.”Makedonski zeleznici”, Skopje

  • Performed projects in the year 2006
    - Installation  of 35kV air duct from TS 35/10kV Madzari to  TS 110/35/10kV Skopje I

Ministry for labour and social policy

  • Performed projects in the year 2006
    - Performing of construction works for landline performing : “Asylum  applicants shelter”
  • Performed projects in the year 2007
    - Performing of the facade on Child Nursery “Dame Gruev”,  Skopje

GRADBA PROMET ALKI, Skopje

  • Performed projects in the year 2006
    - Delivery and installation of the transformer station TS 10/0.4kV; 630(1000)kVA

MZT PUMPI, Skopje

  • Performed projects in the year 2006
    - Thermal-isolation of the pipe-lines and reservoirs: FERONICEL, Glogovac

TEC NEGOTINO, Negotino

  • Performed projects in the year 2007
    - Performing of construction works
  • Performed projects in the year 2008
    - Building stuffs in TEC Negotino
INTERUNION-ENG, Skopje
  • Performed projects in the year 2007
    - Delivery and installation of the equipment for 10kV air tap and steel-truss transformer station 10/0.4kV; 250kVA

CUCER SANDEVO Munacipality

  • Performed projects in the year 2007
    - Delivery and installation of the equipment for 10kV air tap and steel-truss transformer station 10/0.4kV; 160kVA

CMC EKO CON, Skopje

  • Performed projects in the year 2007
    - Delivery and installation of the concrete shroud for TS and complete equipment for transformer station 10/0.4kV; 1000kVA
ЕСМ-ЕВН, Скопје
  • Performed projects in the year 2007
    - Delivery of the copper and aluminum cables
    - Foundation performing for the concrete poles , for reconstruction of the NN wiring  in Bosilovo TS 10/0.4kV Elektro-Strumica
Општина Ресен
  • Performed projects in the year 2006
    - Delivery of the aluminum cable, galvanized strip for grounding and GAL shield
Аrcerol Mittal (HRM) Skopje
  • Performed projects in the year 2008
    - Service offering (low-loader and crane trucks , from 12 up to 18m)
  • Performed projects in the year 2009
    - Service offering (low-loader and crane trucks , from 12 up to 18m)
  • Performed projects in the year 2010
    - Service offering (low-loader and crane trucks , from 12 up to 18m)
KOGEL SEVER Skopje
  • Performed projects in the year 2009
    - Thermal insulation of the equipment and installation in Cogenerative gas plant

‘Gazi Baba’ Municipality, Skopje

  • Performed projects in the year 2009
    - Street lighting performing
    - Maintenance and reconstruction of the street lightening
АД во државна сопственост за вршење дејноста давање услуги во воздухопловната навигација „М-НАВ“ Скопје
  • Performed projects in the year 2010
    - Delivery of the spare parts for electronics and mechanical engineering
ПРАКТИКА-МС, Скопје
  • Performed projects in the year 2010
    - Supply, delivery and stationing of the transformer type ETN 5-20, 10/0.4kV, 50kVA
    - Supply, delivery and wiring of the 10kV lines with copper (Cu)50mm2 from the splitter to transformer
    - Supply and installation of the 10A VN fuse
    - Dismantling of the damaged 10kV insulator and supply and installation of the new one on the pole
АД “Аеродроми на Македонија„ Скопје
  • Performed projects in the year 2010
    - Measuring and analyzing resistance of the windings on the generator insulation aggregate